Skip to main content

Backyard

We've been very slowly attempting to convert the South Lawn into more than a grass pit and parking lot.

We started earlier in the year by having TROSA come and remove all of the leaves, ivy, and debris from the yard. We then fixed the fence at the back property line so none of us would fall over the 8ft drop into the church parking lot behind our house. Fun times. One day, the tree that is on their property that leans over their church is going to fall.  We've talked to them so many times, offering to let them use our yard to trim or remove the tree... their response was that they have insurance if anything happens. 

OK then. 

Then, we finally got started building the swingset.


Hard to believe, but when Harris and our friend/neighbor Rob went to disassemble and bring the parts back from Raleigh, the dolphin swing was for Margot. She got her ride in it, was joyful, then moved on to the big girl swings. 

Madeline taking pictures of me and Marianne. 


Madeline climbs on her own, Margot needs a little boost. The fairy skirt trees aren't covered in ants yet this season so are still fun to daydream in. 



Margot got first slide. Madeline first twirl on the disk swing thing.


We bought the swingset on Craigslist for $300, disassembled and transported it, left it sitting in our yard in pieces for a year, then after buying $300 worth of parts (it is a 20 yr old wooden swingset afterall) Harris spent a leisurely two afternoons reassembling everything and building a platform where the sandbox used to be.  New these are several thousand. Our girls are delighted with their $700 20 year old swingset. 


Comments

Popular posts from this blog

a second kitchen design

Taking into account comments, good ideas, and original plans I think we have a new contender. No, before we hadn't thought about where the microwave would go or the trashcan. :) Originally Sara had us putting the range on the chimney and running counters all around it. We couldn't figure out how in practise that would work and started dreaming about dual ovens and cooktops in counters and all sorts of things that are fancy and pretty, but not really needed for how we live now or plan to live later.    This one gives Harris a gas cook top and me a convection oven. Dual fuel from bosch and we're both happy.     It also creates two separate work stations on either side of the range and will fit around the door that will exist for the next year, but not forever. I like that this way we're not building out something that will have to be torn out in 12 months. I really really hate that.   ...

Light rebuilding

Living Room Light, before we bought the house, hanging in the living room with the dropped ceiling, termite eaten floor, and paneled walls. You'll notice it is both electric and gas.   Harris rebuilt the light fixture, cleaned the hell out of it, and hung it in the entryway to the house. In the process he flipped the direction of the bulbs so it is now an uplight fixture.

Budget

Dad was asking about the budget and how we're doing so far. Initially we had a total budget of about $350k for the house. As we negotiated the purchase price up and found more information about what the house needed that budget went to a maximum of about $415k. As of today, we anticipate spending around $400k or ~$111/sqft. As a comparison, Oakwood cost us $90/sqft and we sold for $106/sqft and the new owners are doing all kinds of neat stuff we dreamed about doing. So far we're under budget in a couple of areas, within budget but ahead of schedule in some (which can also be read as over budget...) and just going to be way over in a couple of key areas. Our original plan including making a temporary kitchen that we could live with, but would be massively overhauled within a year or two. Instead we decided to do it right the first time and enjoy it the entire time. To this end, our temp budget for cabs, appliances, and counters, was initally $5,600. However, that's g...