Suite tile

Floor tile is down in the downstairs bathroom. Just as pretty as we expected. Today they are going to grout and I think re-install the line of salvaged sanitary tiles between the floor and wall. Then we can install the toilet (left corner) and tub (right wall) 

Delays

Sometimes there are delays... The wire the electricians need will not arrive until later today (at the earliest) pushing the switch over from 2 100 amp boxes to 1 400 amp box until Monday Brad, Ed's apprentice in the plaster trade, hurt himself over the weekend, so wasn't able to work Monday or Tuesday. Luckily he was able to rejoin Ed today and they continue to prep walls upstairs.  We may get three bedrooms finished - we may get two bedrooms finished. Here's hoping for three. The tile for downstairs arrived and...it's going to be much more complicated to lay than we thought. Have two people giving estimates this week (hopefully) to do the work.  Still waiting to hear from the plumber if for some stupid reason them replacing the toilet (not changing anything other than the damn fixture) needs a building permit (it doesn't plumber. Get your head on right).  But I would like that bathroom finished ASAP thank you very much. We have many things that are at 50%...

Downstairs bathroom

Harris has been getting everything ready in the bathroom which means we need to find the tile we want in that bathroom.  Think this is the Hakati pattern we're going to go for, just need to confirm with Paul at Common Ground they can get this and it will work like we think.