Skip to main content

Detail work

Some of the detail work Harris is completing during nap time.

I am in charge - at least 90% of the time - of acquiring materials for the project. I search Craigslist and ebay for appropriate period details and reproductions when Margot wakes me up in the middle of the night. I've been hunting for about 12 months for a wrought iron gate for the front fence. I'll find it eventually. 

These then become Harris projects for installation. 

This is the before and after shot of two different doors. The one on the right hasn't had a knob or back plate for at least a year. The one on the left has an original to the house but uncleaned mortise set, back plate, and knob. 

While Margot naps Harris cleans the paint off the metal, polishes the knobs, and then installs. This one is different from all the rest and goes to our unfinished master suite. 



Other fun details. Harris replaced all of the light switches with UL listed push button switches after I found a lot on Ebay. 

Comments

Popular posts from this blog

a second kitchen design

Taking into account comments, good ideas, and original plans I think we have a new contender. No, before we hadn't thought about where the microwave would go or the trashcan. :) Originally Sara had us putting the range on the chimney and running counters all around it. We couldn't figure out how in practise that would work and started dreaming about dual ovens and cooktops in counters and all sorts of things that are fancy and pretty, but not really needed for how we live now or plan to live later.    This one gives Harris a gas cook top and me a convection oven. Dual fuel from bosch and we're both happy.     It also creates two separate work stations on either side of the range and will fit around the door that will exist for the next year, but not forever. I like that this way we're not building out something that will have to be torn out in 12 months. I really really hate that.   ...

Light rebuilding

Living Room Light, before we bought the house, hanging in the living room with the dropped ceiling, termite eaten floor, and paneled walls. You'll notice it is both electric and gas.   Harris rebuilt the light fixture, cleaned the hell out of it, and hung it in the entryway to the house. In the process he flipped the direction of the bulbs so it is now an uplight fixture.

Budget

Dad was asking about the budget and how we're doing so far. Initially we had a total budget of about $350k for the house. As we negotiated the purchase price up and found more information about what the house needed that budget went to a maximum of about $415k. As of today, we anticipate spending around $400k or ~$111/sqft. As a comparison, Oakwood cost us $90/sqft and we sold for $106/sqft and the new owners are doing all kinds of neat stuff we dreamed about doing. So far we're under budget in a couple of areas, within budget but ahead of schedule in some (which can also be read as over budget...) and just going to be way over in a couple of key areas. Our original plan including making a temporary kitchen that we could live with, but would be massively overhauled within a year or two. Instead we decided to do it right the first time and enjoy it the entire time. To this end, our temp budget for cabs, appliances, and counters, was initally $5,600. However, that's g...