Skip to main content

Snapshot

We're cleaning out the storage unit so that currently our stuff is in our apartment, in long term storage, or is at the house. Soon, it will be with us or long term storage.
 
Madeline's room will be used to store things from the apartment, once we're moving things up there. Bill pulled many nails and swept up in here. Now begins the battle against dust.
 
 
 
 
 
 
this is the bedroom across the hall from Madeline's room. Storage unit is being emptied into this room right now. Surprisingly less in the storage unit than we thought.
 
 
 
 
Here's our kitchen!
 
 
 
That will soon enough live here. Yes, I know, need to touch up some paint there...
 
 
 
 
And another gratuitous floor shot!
 
 
 
 
 
 
This will be our bedroom when we move into the house. Madeline calls it the rainbow room because of the rainbows from the bevels in the windows. You can see the pattern in the floor.  

 
New dining room floor. Yes, we'll be patching that bit of wall there....
 

Comments

Popular posts from this blog

reflecting, thinking about what's next

Reading through the blog, mainly to look at the ruin that was our house and the wee little babes that were our babies, now walking, running, yelling girls and found this from January 2016 What's left - the girls bathroom, master suite, sunroom, tile patching in 2 bathrooms, butler pantry. Summer kitchen. Landscaping. We've completed the girls bathroom, butler pantry, and landscaping. The sunroom is ALMOST finished. After living in the house with three girls we've changed plans a little bit for the remaining work. We're opting to turn what would have been mine and Harris's bedroom, closet, and bathroom into a bonus room of sorts. We'll also leave the wall there and add the washer/dryer upstairs and some desk space so the girls have a place to work. We also will build a general storage closet up there so clothing doesnt have to go up and down to the attic each season. We've also decided we need a shower upstairs, so the clawfoot that is in bad shape up...

a second kitchen design

Taking into account comments, good ideas, and original plans I think we have a new contender. No, before we hadn't thought about where the microwave would go or the trashcan. :) Originally Sara had us putting the range on the chimney and running counters all around it. We couldn't figure out how in practise that would work and started dreaming about dual ovens and cooktops in counters and all sorts of things that are fancy and pretty, but not really needed for how we live now or plan to live later.    This one gives Harris a gas cook top and me a convection oven. Dual fuel from bosch and we're both happy.     It also creates two separate work stations on either side of the range and will fit around the door that will exist for the next year, but not forever. I like that this way we're not building out something that will have to be torn out in 12 months. I really really hate that.   ...

Budget

Dad was asking about the budget and how we're doing so far. Initially we had a total budget of about $350k for the house. As we negotiated the purchase price up and found more information about what the house needed that budget went to a maximum of about $415k. As of today, we anticipate spending around $400k or ~$111/sqft. As a comparison, Oakwood cost us $90/sqft and we sold for $106/sqft and the new owners are doing all kinds of neat stuff we dreamed about doing. So far we're under budget in a couple of areas, within budget but ahead of schedule in some (which can also be read as over budget...) and just going to be way over in a couple of key areas. Our original plan including making a temporary kitchen that we could live with, but would be massively overhauled within a year or two. Instead we decided to do it right the first time and enjoy it the entire time. To this end, our temp budget for cabs, appliances, and counters, was initally $5,600. However, that's g...