Skip to main content

Posts

Showing posts with the label suite

Closet

Closet bar in closet ready for clothes.  Remaining closet is not ready for clothes. Needs to be cleaned and a new floor put down...then we have lovely walk-in closet.  

Plaster repair is amazing

What a time! Ed and Brad have spent 18 days at the Bunny Manse working on the plaster repair in the dining room, suite downstairs, main hall, and butler hall.  They have scraped, opened cracks, bolted the plaster to the wall, repaired holes, and provided the new base coat on top of all of this. Every night we go up and there is visible progress. By the end of next week the walls and ceilings in this section of the house we will occupy should be finished and colored. We figured out the cost of time and money of ripping out the plaster, rippping out the lathe, disposing of all of that, reinsulating the walls, firing the 2x4s, putting up drywall, priming the drywall, and then providing the finish painting to the drywall. Much more labor intensive and expensive than Ed. While Ed is by no means inexpensive, his work is beautiful, professional, and will last longer than we will in this house.  If you think about ripping out original plaster and lathe because there are a few...